Sequence of Operations (SOO)
Pilot Pre-Flight Checklist
একজন pilot takeoff করার আগে — তারা শুধু throttle push করে না:
Engine check
Flaps to position
Runway clearance confirmed
Speed check at V1
Rotate at V2
Gear up at safe altitude
প্রতিটি step ক্রমানুসারে। একটি বাদ দিলে — safety compromised হয়।
AHU Sequence of Operations:
START SEQUENCE:
Step 1: Confirm no fire alarm active
Step 2: Open outside air damper → wait 30 seconds
Step 3: Start supply air fan → confirm run feedback within 5 seconds
If no feedback in 5 seconds → raise fault alarm, do not proceed
Step 4: Enable chilled water valve PID control
Step 5: Enable heating valve PID control
Step 6: Start return air fan
RUNNING:
Control supply air temperature at 16°C via CHW valve PID
Control space temperature at 24°C
Monitor CO2 → adjust fresh air damper via DCV logic
Monitor filter DP → alarm if above limit
STOP SEQUENCE:
Step 1: Close chilled water valve fully
Step 2: Stop supply air fan
Step 3: Stop return air fan
Step 4: Close outside air damper after 60 seconds
FIRE MODE:
Immediate stop on fire alarm signal
All dampers close
Manual restart required — no auto restart on fire
SOO হল English language description।
FBD হল একই logic-এর visual drawing।
Controller হল সেই machine যা এটি run করে।
SOO BMS design engineer দ্বারা লেখা হয়। FBD SOO থেকে programmed করা হয়। Commissioning verify করে যে উভয়ই reality-র সাথে match করে।