Sequence of Operations (SOO)
Pilot Pre-Flight Checklist
ஒரு pilot புறப்படுவதற்கு முன் — அவர்கள் வெறும் throttle-ஐ தள்ளுவதில்லை:
Engine check
Flaps to position
Runway clearance confirmed
Speed check at V1
Rotate at V2
Gear up at safe altitude
ஒவ்வொரு step-ம் வரிசையாக. ஒன்றை தவறவிட்டால் — safety பாதிக்கப்படும்.
AHU Sequence of Operations:
START SEQUENCE:
Step 1: Confirm no fire alarm active
Step 2: Open outside air damper → wait 30 seconds
Step 3: Start supply air fan → confirm run feedback within 5 seconds
If no feedback in 5 seconds → raise fault alarm, do not proceed
Step 4: Enable chilled water valve PID control
Step 5: Enable heating valve PID control
Step 6: Start return air fan
RUNNING:
Control supply air temperature at 16°C via CHW valve PID
Control space temperature at 24°C
Monitor CO2 → adjust fresh air damper via DCV logic
Monitor filter DP → alarm if above limit
STOP SEQUENCE:
Step 1: Close chilled water valve fully
Step 2: Stop supply air fan
Step 3: Stop return air fan
Step 4: Close outside air damper after 60 seconds
FIRE MODE:
Immediate stop on fire alarm signal
All dampers close
Manual restart required — no auto restart on fire
SOO என்பது English language description.
FBD என்பது அதே logic-ன் visual drawing.
Controller என்பது அதை run செய்யும் machine.
SOO என்பது BMS design engineer-ஆல் எழுதப்படுகிறது. FBD என்பது SOO-விலிருந்து program செய்யப்படுகிறது. Commissioning இரண்டும் reality-யுடன் match ஆகிறதா என்று verify செய்கிறது.