Ensmart BMS Academy 📞 +91 99410 42612 Home
Products
All Products DDC Controller IO Modules BMS / IBMS Energy Management Tenant Billing AI Analytics EnNode Gateway
Solutions
All Solutions Commercial BMS IT Parks & SEZs Pharma / 21 CFR Healthcare Industrial Retail & Malls Data Centres
Knowledge Hub
Case Studies Blog eNews · eBooks Downloads · Tools Design Engg Portal
Company
About Us ⬡ The 4 Pillars Our Team Approvals FAQ Get a Demo →
Home Case Studies Bafna Pharma
Pharma 2024 📍 Chennai

Bafna Pharma Phase-2 BMS & AI Analytics Optimisation

21 CFR Part 11 compliance, ₹32.26L annualised energy savings, and a transition from reactive to predictive maintenance — through SmartNova's AI-driven pharma automation

Download the Full Case Study →
₹32.26L
Annualised Energy Savings
21 CFR Part 11
Compliance Achieved
100%
Tamper-Proof Audit Trails
Download the Full Case Study

Get the Full Bafna Pharma Case Study

See how EnSmart helped Bafna Pharma deliver this project — full methodology, system architecture, and measurable outcomes inside the PDF.

Download PDF →
Project Snapshot

About this Project

EnSmart deployed the SmartNova Platform at Bafna Pharma in Chennai for the Phase-2 BMS & AI Analytics Optimisation in 2024. This case study captures the deployment, the measurable outcomes and the operational lessons.

📄
Download the full case study
PDF · detailed methodology, system architecture, before/after data
Download PDF →
← Back to all case studies