At SKCL Excellence, TVK Industrial Estate, Guindy, two separate manual burdens were running in parallel every month. Vijay was hand-reading 24 meters across 4 floors to build tenant bills in a spreadsheet. And the building's common areas — corridors, cafeteria, open square zones, vacant shop fronts, and shared passages — had their energy running completely untracked under no CAFM — Common Area Facility Management software whatsoever. EnSmart solved both in a single deployment. One project. One software. Thirty days. Go-live January 2026.
24 tenant meters · 4 floors · 12 EB + 12 DG · Full CAFM — Common Area Facility Management automation · TVK Industrial Estate, Guindy, Chennai · December 2025 to January 2026 · Zero billing disputes since go-live.
Download the Full Case Study →Picture SKCL Excellence on any billing day in late 2025. Vijay, the facilities manager at TVK Industrial Estate, Guindy, is carrying two problems simultaneously — and has no software for either. The first is tenant billing: 24 meters across 4 floors, two power sources, and a spreadsheet waiting to be filled by hand. The second is the building's shared spaces — corridors running the length of every floor, a cafeteria on the ground level, open square areas near the entrance, vacant shop fronts along the perimeter, and common passages connecting everything. All of it consuming electricity every single day. None of it tracked, managed, or allocated under any CAFM — Common Area Facility Management process. Both problems had one solution. EnSmart.
The result:
Inside the full case study, you'll see:
| Year | Milestone |
|---|---|
| Week 1 | Project kick-off at SKCL Excellence, TVK Industrial Estate, Guindy — full site survey covering all 4 tenant floors and all common areas. Meter inventory completed for all 24 tenant meters. Opening readings recorded for custom init fields. Full CAFM — Common Area Facility Management circuit mapping done for corridors, cafeteria, open square areas, vacant shop fronts, and common passages. |
| Week 2 | Hardware wiring and network connectivity completed — all 24 EB and DG tenant meter panels connected floor by floor, and all CAFM — Common Area Facility Management metering points wired and networked across every shared space in the building. |
| Week 3 | Full software configuration — floor-wise tenant meter tagging, EB and DG tariff rates applied per meter, custom init fields entered by Vijay for all 24 meters. CAFM — Common Area Facility Management module configured with every common area mapped, named, metered, and assigned to its circuit. First test billing and CAFM reporting runs validated. |
| Week 4 | Full commissioning — all 24 tenant meters and all CAFM — Common Area Facility Management metering points validated against physical readings. End-user training delivered to Vijay covering tenant floor report generation, CAFM — Common Area Facility Management dashboard navigation, common area consumption views, and complete login handover. |
| Jan 2026 | First live tenant billing cycle and first live CAFM — Common Area Facility Management reporting run — both executed independently by Vijay. Floor-wise tenant reports generated for all 4 floors. All common area dashboards live. Zero vendor involvement from Day 1 of go-live. |
See how EnSmart helped SKCL Excellence — Sri Kausalya Constructions Ltd deliver this project — full methodology, system architecture, and measurable outcomes inside the PDF.
Download PDF →EnSmart has deployed Tenant Billing Software, CAFM — Common Area Facility Management, Energy Management Systems, and Building Management Systems across commercial towers, IT parks, hospitals, pharma plants, and data centres across India — all on the SmartNova Platform. Open-protocol. ISO 16484:2024 compliant. Built to be owned and operated by the facility team, not maintained by the vendor.